OPCOM command center working group & TDY to New London for Master OPC meeting.

Highlights:
  • Developed process mapping process for the OPCOM command center working group to use as they flesh out the responsibilities, functions, and processes for the new Coast Guard Operations Command Center. Presented, along with George, hour-long presentation to the working group. (8 hours billable. 4 for development, 1 for presentation, 3 for attending working group meeting)
  • Attended a meeting at the Leadership Development Center for the designated master organizational performance consultants.  This meeting was called by CG-0931.  A detailed review is included at the bottom of this report.
  • Wrote several posts for From Inside the Firewall to both add to the pool of knowledge and to increase partnerships with other partner agencies.
Answering questions posed previously:  At an earlier post, a question about the ULDP-36 survey was posted.  The ULDP-36 is the unofficial title for the survey/assessment tool which units can use to assess the state of leadership development at their unit.  The survey was developed by the Leadership Development Center, provides data on 19 of the Coast Guard's leadership competencies (all the competencies but those in the "leading the Coast Guard" segment), and is an integral component of the ULDP website.

Future look:
  • Week of 18 August: In Hampton Roads
  • Week of 25 August: Teaching the CG Team Leader/Facilitator course at Training Center Yorktown with two other instructors from the Leadership Development Center. This gig is at the request of the LDC and supports local commands' desires for more trained facilitators.
  • Week of 1 September: Attending the Coast Guard HPT Workshop in Williamsburg.
Additonal taskers to be completed:
  • Travel claim for New London trip.
  • Not generated from this period, but need to follow-up on client work at LSU, TCCM, ISC STL.

Summary for this reporting period
Hours Worked: 47.25
Travel hours outside work hours: 8.0
Billable hours/direct client work: 8.0 (not including work for CG-0931 at the LDC)
Days away from home: 4

======================================
**** LANTAREA (Am) Trip/Activity Report *****
======================================

Submitted by: Peter Stinson, Amp

Trip Report: Master OPC Meeting sponsored by CG-0931

Itinerary:
  • 13 August: Traveled to New London
  • 14-15 August: Meetings at the Leadership Development Center
  • 16 August: Returned to Hampton Roads
Team lead: Attended meeting at the request of CG-0931, Danny Prosser, OPC Program Manager

Assisted by: both George and Byron participated in parts of what I participated in.  Each of us had some overlap of activity, but not 100%.

Purpose of Trip:

The purpose of this trip was to participate in the CG-0931 sponsored Master OPC meeting, to sit on a panel for the LDC's OPC course, and to participate in a meeting on OPC measurement honcho'd by Byron.

Summary of activity:
  • Met all the students in the LDC's OPC course, including the new D5 OPC for whom I'm serving as a mentor.  The course was wrapping up; graduation was on Friday.
  • Served as a member of the Masters' Panel, a presentation and Q&A for the OPC course students.
  • Participated in a meeting of seasoned consultants working to create a customer satisfaction process for the OPC cadre.  While Byron was the driver for this session (and facilitated it), t6he owner of this process is the OPC program manager (CG-0931). From this session, we came to consensus on a Level I customer satisfaction determination process which CG-0931 will implement with assistance from the two area program managers (George being one of those).
  • Participated in Masters' meeting.  Primary agenda item for this session was to develop the strawman for a consulting contract between CG-0931 and CG-01T for OPC support to the four modernization effort initiatives.  We developed an initial consulting contract which CG-0931 will take for action to nail down an agreement with CG-01T.  Of note, it is proposed that each modernization team (DCMS, DCO, FORCECOM, and OPCOM) will receive support from OPCs and at least one master-level OPC will work with each modernization effort.  We also agreed that due to other work, the level of effort for this would be no more than 30%, but it may include contributions from all OPCs throughout the Coast Guard.

    Additional topics of discussion included the agenda for the annual OPC conference, this year to be held outside Dulles in northern Virginia the last week of September, and a proposed charter for the master OPC team.  The agenda for the conference will include four primary content blocks: direction, information sharing, social networking, and common areas of practice.
Way ahead:  Attend OPC Conference in September.  Continue to help with charters, contracts, and agendas as discussed.